home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / spacedig / v15_1 / v15no130.txt < prev    next >
Internet Message Format  |  1993-07-13  |  10KB

  1. Date: Fri, 21 Aug 92 05:03:51    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #130
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Fri, 21 Aug 92       Volume 15 : Issue 130
  10.  
  11. Today's Topics:
  12.               Energya and Freedom and Soyuz ACRV and...
  13.                    Return of payloads from Freedom
  14.           Saturn class (Was: SPS feasibility and other space
  15.                             space industry
  16.              SPS feasibility / Astrophysical Engineering
  17. superstrings & supralight (was SPS feasibility and other space development)
  18.  
  19.     Welcome to the Space Digest!!  Please send your messages to
  20.     "space@isu.isunet.edu", and (un)subscription requests of the form
  21.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  22.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  23.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  24. ----------------------------------------------------------------------
  25.  
  26. Date: 20 Aug 92 11:56:51 GMT
  27. From: Gary Coffman <ke4zv!gary>
  28. Subject: Energya and Freedom and Soyuz ACRV and...
  29. Newsgroups: sci.space
  30.  
  31. In article <1992Aug18.125700.16134@iti.org> aws@iti.org (Allen W. Sherzer) writes:
  32. >In article <1992Aug17.155955.24162@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  33. >
  34. >>Shuttle fixed cost is around $5 billion a year, but support for Fred
  35. >>after PMC will only occupy 1/4th the Shuttle fleet at any given time. 
  36. >
  37. >The Shuttle flies eight times a year and four of those are needed for
  38. >Fred resuply. Thus Fred uses 50% of Shuttle at an anual cost of $2.5
  39. >billion (1.5 times the cost of doing the same thing with expendables).
  40.  
  41. The Shuttle has flown 8 times a year without Endeavor and with Columbia
  42. down for update mods. NASA is taking about 2 months at it's current
  43. leisurely pace, one shift, no overtime, to stack and launch a Shuttle. 
  44. There are two pads and room in the VAB for two Shuttle stacks. Thus
  45. with a full fleet of four, NASA should be able to launch once a month
  46. for a total of 12 launches a year if that many missions are available.
  47.  
  48. That assumes Shuttle lands at the Cape saving two weeks, and that 
  49. Shuttle mission time is two weeks in orbit. That leaves two months
  50. prep time before that Shuttle has to fly again.
  51.  
  52. Shuttle resupply missions should be somewhat simpler to prep than
  53. science missions like Spacelab and Astro where complex payloads need
  54. to be integrated into the payload bay and experiment racks swapped on
  55. the middeck.  So without three shifts and overtime galore, NASA should
  56. be able to do four Fred support missions without seriously impacting
  57. other mission timetables. They *have* flown 8 missions with fewer than
  58. four available Shuttles.
  59.  
  60. >If we use Shuttle for ACRV then Fred uses 100% of Shuttle flights for
  61. >an anual cost of $5 billion. This is five times the cost of doing the
  62. >same thing with expendables.
  63.  
  64. This is simply nonsense. The same four launches are required for using
  65. Shuttle as ACRV as for resupply. The resupply Shuttle just stays up
  66. until the next one arrives in three months. Still four launches, and
  67. still four recoveries. The only difference is the duration of the
  68. flight. Thus each of two Shuttles devote a total of half a year in orbit
  69. at Fred. While at the station, the Shuttle provides additional workspace
  70. equivalent to two station modules. The long duration Shuttle is in the
  71. works anyway, and when docked at Fred, it doesn't have to draw as heavily
  72. on it's own expendibles as it would as a free flyer.
  73.  
  74. Given that Shuttle is used for resupply, it makes sense to just dock the 
  75. long duration modified Shuttle at Fred until the next flight. Now if
  76. you do resupply on expendibles, then having the Shuttle at Fred doesn't
  77. make sense simply as an ACRV replacement. Then using Soyuz makes sense.
  78. But the long duration Shuttles *can* do the job for under $2.5 billion
  79. a year while giving additional capacity to Fred. Plus the remainder of
  80. the Shuttle fleet remains alive to do other missions like Astro.
  81.  
  82. Gary
  83.  
  84. ------------------------------
  85.  
  86. Date: 20 Aug 92 14:58:25 GMT
  87. From: Josh 'K' Hopkins <jbh55289@uxa.cso.uiuc.edu>
  88. Subject: Return of payloads from Freedom
  89. Newsgroups: sci.space
  90.  
  91. amon@elegabalus.cs.qub.ac.uk writes:
  92.  
  93. >> Allan you have still not addressed with numbers the propostion that  
  94. >the
  95. >> Shuttle will become MORE useful as the return of large payloads  
  96. >grows more
  97. >> common in the SSF era.
  98. >>
  99.  
  100. >WHAT large payloads? There ARE no large payloads until we actually GO  
  101. >somewhere. There is nothing in LEO to bring back. And if we do have  
  102.  
  103.     On the contrary, as currently designed, Freedom requires the return
  104. of materials on a regular basis.  The engines are designed in 6 (?) modules
  105. that require refueling on Earth.  Current plans have them being rotated out
  106. on a regular baisis.  Since these are almost certainly too large to return in
  107. a Soyuz, you're going to need to redesign them (previously they would have been
  108. H2-LOX run off waste water but that was expensive), or add a vehicle that
  109. can return moderate size payloads.  Or maybe this was covered and I just missed
  110. it.
  111.  
  112. >The shuttle has already lived a longer time than most of the really  
  113. >early cargo aircraft (ie pre-Ford Trimotor and DC-3). It will have an  
  114. >honored place at NASM and will probably be sitting there before 2005.
  115.  
  116.     Well, just to pick nits, NASM already has a shuttle and DC-3s are still
  117. flying.  One has the equivalent of something like 6 million miles on it.  Pre-
  118. DC-3 craft probably weren't popular for long, but I bet there were some that 
  119. flew for 15 years.
  120.  
  121.  
  122. -- 
  123.     Josh Hopkins       j-hopkins@uiuc.edu, or jbh55289@uxa.cso.uiuc.edu
  124.  
  125.         "A goal is a dream taken seriously."    -Uncle Walt.   
  126.  
  127. ------------------------------
  128.  
  129. Date: 20 Aug 92 11:24:21 GMT
  130. From: Nick Szabo <szabo@techbook.com>
  131. Subject: Saturn class (Was: SPS feasibility and other space
  132. Newsgroups: sci.space
  133.  
  134. In article <19AUG199220200286@judy.uh.edu> wingo%cspara.decnet@Fedex.Msfc.Nasa.Gov writes:
  135.  
  136. >It is simple. Look at the growth in size of geosync communications satellites.
  137. >Ariannispace has and that is the basline for the growth into the Arianne 5.
  138.  
  139. Ariane 5 was sized for Hermes, with the capability of launching multiple
  140. comsats tacked on to the requirments.  With the delays in Hermes that is
  141. now the 5's primary task.  Despite silly Arianespace "studies" trying to
  142. justify a Hermes-sized rocket, the next generation communications
  143. satellites will be the same size (eg Intelsat-K).  They are looking for 
  144. standardization, not to force a redesigned launcher for every new generation
  145. of satellite.  Heavy-lift vehicles from Saturn to Energiya to NLS have 
  146. not and do not have any sort of commercial market, despite $dozens of 
  147. billions spent in them. Even the Titan IV has only a dwindling military market.
  148.  
  149. If rocket designers want to contribute to expanding space industry, they
  150. need to change the nasty habits they have developed over the last two
  151. decades of slow progress rocketry.  They must stop dictating to 
  152. their customers and start giving them the services they need -- 
  153. standardized, lower cost, more reliable launch.
  154.  
  155.  
  156. -- 
  157. szabo@techbook.COM  Public Access User --- Not affiliated with TECHbooks
  158. Public Access UNIX and Internet at (503) 644-8135 (1200/2400, N81) 
  159.  
  160. ------------------------------
  161.  
  162. Date: 20 Aug 92 13:32:54 GMT
  163. From: Gary Coffman <ke4zv!gary>
  164. Subject: space industry
  165. Newsgroups: sci.space
  166.  
  167. In article <1992Aug19.135709.17016@iti.org> aws@iti.org (Allen W. Sherzer) writes:
  168. >In article <1469100011@igc.apc.org> Mark Goodman <mwgoodman@igc.apc.org> writes:
  169. >>There are really no private space launch providers
  170. >>outside the United States -- Arianespace is the closest thing.
  171. >
  172. >So what are Atlas, Delta, and Titan, chopped liver?
  173.  
  174. Old ICBMs from captive government contractors.
  175.  
  176. Gary
  177.  
  178. ------------------------------
  179.  
  180. Date: Thursday, 20 Aug 1992 16:52:44 CET
  181. From: "Hugh D.R. Evans" <HEVANS@ESTEC.BITNET>
  182. Subject: SPS feasibility / Astrophysical Engineering
  183. Newsgroups: sci.space
  184.  
  185. In article <1548@hsvaic.boeing.com>, eder@hsvaic.boeing.com (Dani Eder) says:
  186. >
  187. >I'm working on a book that discusses DISMANTLING planetary bodies
  188. >(and rebuilding them more to our liking, sigh - all that wasted
  189. >mass inside planets doing nothing more useful than holding
  190. >atmospheres down, sheesh what poor design).
  191. >
  192. >
  193. ...stuff deleted...
  194. >Methods of disassembly include:
  195. >
  196. >(1) Large body impact
  197. >
  198. >Messy, but quick.  Don't let the pieces re-coalesce into a body
  199. >again.
  200. >
  201. >(2) Big bomb(s)
  202. >
  203. >Again, messy.
  204. >
  205. >(3) Spin up to orbital speed.
  206. >
  207. >You collect stuff off the equator that is now orbital.
  208. >
  209. >(4) Boiloff
  210. >
  211. >Good for removing pesky atmospheres, takes longer to evaporate
  212. >planet.  Use lots of concentrated sunlight
  213. >
  214. >(5) Mining
  215. >
  216. >Mass drivers, tethers, etc.
  217. >
  218. >
  219. >For those who are wondering why I am considering such stuff --
  220. >Understanding how such large scale engineering might be done can
  221. >tell us what to look for around other stars in the search for
  222. >life in the Universe.
  223. >
  224. >Dani
  225. >
  226. >--
  227. >Dani Eder/Boeing/Advanced Civil Space/(205)464-2697(w)/232-7467(h)/
  228. >Rt.1, Box 188-2, Athens AL 35611/Member: Space Studies Institute
  229. >Physical Location: 34deg 37' N 86deg 43' W +100m alt.
  230. >***THE ABOVE IS NOT THE OPINION OF THE BOEING COMPANY OR ITS MANAGEMENT.***
  231.  
  232.  
  233.  
  234. Hmmm. I wonder what the environmental impact of redistributing the Earth
  235. would be...:):) :)
  236.  
  237. Hugh
  238.  
  239.    Standard Disclaimer...    * Inet:   hevans@estwm8.dnet.estec.esa.nl
  240.                              *     or  hevans@estec.esa.nl
  241. "The road to nowhere is      * SPAN:   ESTCS1::HEVANS
  242.     shorter than you think"  * BITNET: HEVANS@ESTEC
  243.  
  244. ------------------------------
  245.  
  246. Date: 20 Aug 92 14:37:10 GMT
  247. From: Brian Tarbox <btarbox@sw.stratus.com>
  248. Subject: superstrings & supralight (was SPS feasibility and other space development)
  249. Newsgroups: sci.space
  250.  
  251. Can someone explain (simply, please), what superstrings are?
  252.  
  253. ------------------------------
  254.  
  255. End of Space Digest Volume 15 : Issue 130
  256. ------------------------------
  257.